Hydro Electric Power Project Opportunity in Kochi, India
Established | 40-50 year(s) |
Employees | 1000 - 5000 |
Legal Entity | Private Limited Company |
Reported Sales | Nil |
Run Rate Sales | Nil |
EBITDA Margin | Nil |
Industries | Renewable Power Plants |
Locations | Kochi |
Local Time | 6:37 PM Asia / Kolkata |
Listed By | Management Member |
Status | Moderately Active |
- Promoter of the project has 30+ years of experience in execution of work for more than 110 Power Projects.
- This project is one of the rare high head projects in this region. Head is above - 400 mtr.
- Said project is allocated by Government of Kerala on BOOT basis for 30 years.
- All power generated by this project will be solely purchased by State Government for entire duration of project.
- Present rate of PPA is Rs. 4.65 Per Unit. Which is likely to increase in coming years.
- Annual Estimated Salable Energy Generation is = 64.95 MU.
- Total Project Cost is Rs. 148 Crore. Project is financed by 70% Debt Funding and 30% Equity Funding. Out of which we are looking for equity partners upto 45 (i. e Upto Rs. 20 Crore (45% of total Equity Investment of Rs. 44 Crore.
We would like to mention that we have long experience of executing design, manufacture, supply, erection, testing and commissioning work of critical type of sophisticated Gates, Gantry Cranes and Trash Rack Cleaning Machines in different projects like Tala Hydro Electric Project,.
We have executed major works like structural steel works, low pressure piping & cw piping works, fire detection & protection system, fuel oil handling system, misc tanks, etc. , under the Ntpc, Eil, Tce, Desein, Fichtner, Tneb, Abb-lumas, Dcpl, Npcil, Alstom, Bechtel, Raytheon, Hanjung, Sergent & Lundi, Apgenco, Etc.
Related equipment for water intake.
We are also manufacturing intake equipment, which are as under: -
Through Flow TBS.
Dual Flow TBS.
Strainers, Wash water system and related instrumentation.
Stop log gates with embedded parts.
Coarse screens.
Trash racks and Automatic trash raking screen.
Trash rack cleaning machines.
Gantry cranes / EOT cranes.
Power Generation through Hydro Electric Power Project.
State Government of Kerala has assigned 19.8 MW Hydro Power Project to us on BOOT basis for 30 years.
-
Earlier than 15 daysExecutive Director, New Delhi, Financial Consultant connected with the Business
-
Earlier than 15 daysFounder, Mumbai, Financial Consultant connected with the Business
-
Earlier than 15 daysCEO, Engineering & Electrical Manufacturing, Mumbai, Corporate Investor / Buyer connected with the Business